Dolphins – Brégaillon
Construction of two mooring/berthing dolphins with a nominal capacity of 900 kN.m. Each of these structures consists of 3 piles driven with a diesel hammer of 1220 mm, 23 mm thick, and 25 m long, surmounted by a prefabricated concrete piece supporting the mooring defense.
Date
2009
localisation
Brégaillon, France