FREMM Esid wharf

In collaboration with Spie Batignolles/Setec/Inéo, construction of 2 turnkey wharves including all the networks and fluids of 180 m long and 17 m wide for the new Frégattes de la Marine Nationale (FREMM). Each wharf is based on 72 driven piles of 711 mm in diameter and 40 m long (30 m in the ground) laid to length. The civil engineering structure is made up of 208 prefabricated concrete pieces weighing up to 85 tonnes and a total of 3,500 m3 of concrete per structure.

Date
2016-2020
localisation
Toulon, France