previous arrow
next arrow
Slider

Rehabilitation of Station B at Mohammedia Oil Terminal

Deconstruction of two damaged dolphins and installation of two new dolphins in an operating oil terminal. Négri completed the work in record time by reusing the foundations of the old damaged dolphins. The work consisted of cutting the metal tube of the old dolphin, curing the concrete inside the old dolphin and finally inserting and sealing the new tube in the foundation of the old dolphin.

Date
2012
localisation
Mohammedia, Morocco