Supply, Construction and Opening of 3 new dolphins at the Phosboucraa loading terminal
Design and installation of 3 dolphins on an operating mineral terminal. Each dolphin consists of 3 tubes with a diameter of 1300 mm and variable thickness and grade. The works were carried out in the open sea on an exposed site using a self-lifting pontoon.