Water intake for Cycofos power plant

Design, study, and realization for Alstom of 2 water intakes for power plants in Fos-sur-Mer.
These operations required the adjustment of the bottoms, the assembly, and ballasting of 6 HDPE pipes with diameters of 2000 and 2200 mm, the transfer on-site, the immersion of the pipes, and the construction of the protective shells.
The suction heads were specially designed to comply with very strict environmental and sedimentary constraints.

Date
2007
localisation
Fos-sur-Mer, France